Arrow Lakes Hydro Generating Station: Commissioning of Electrical Generators & Associated GIS Equipment |
|
|
|
Client: |
|
Peter Kiewit Sons Co. |
|
Location: |
|
Arrow Lakes Generating Station near Castlegar, BC |
|
General scope of work: |
|
Working under the general supervision of the on-site Electrical Engineer, Gary Bashforth assisted with pre-commissioning tests and commissioning of units one and two at this new Columbia Power Corporation generating station. |
|
Gary performed most of the pre-commissioning testing of the current and potential transformers used for metering and protection of the 230kV transmission interface system, the 13kV generator terminal equipment and station auxiliary equipment, including the 125V DC battery systems. |
|
|
Key activities: |
|
• |
Testing, commissioning and associated reporting |
|
|
|
|
|